Likelihood Weighting - Python Automation and Machine Learning for ICs - - An Online Book - |
||||||||
| Python Automation and Machine Learning for ICs http://www.globalsino.com/ICs/ | ||||||||
| Chapter/Index: Introduction | A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | Appendix | ||||||||
================================================================================= Likelihood weighting is a technique used in probabilistic graphical models and Bayesian networks for estimating probabilities. It is particularly useful in the Bayesian networks when dealing with evidence or observations. In Bayesian networks, nodes represent random variables, and edges represent probabilistic dependencies between them. Given evidence or observations in some nodes, likelihood weighting is used to estimate the probability of certain events or states in the network. The basic steps of likelihood weighting are:
Likelihood weighting is particularly useful when there's evidence present in the network, as it avoids sampling from unlikely portions of the state space by assigning weights to samples based on the likelihood of the evidence. This makes it more efficient than simple random sampling when dealing with Bayesian networks. The use of weights in likelihood weighting helps correct for the fact that the samples are not uniformly distributed in the state space but are biased towards regions consistent with the observed evidence. Let's consider a simplified Bayesian network involving two variables: "Rain" and "See doctor," where "See doctor" is dependent on "Rain." The conditional probability table might look like this: P(Rain) --------- Rain = light: 0.3 Rain = heavy: 0.7 P(See doctor | Rain) --------------------- Rain = light: 0.1 (on time), 0.9 (late) Rain = heavy: 0.9 (on time), 0.1 (late) Suppose we observe that the person sees the doctor on time (i.e., "See doctor = on time"). We want to estimate the probability of light rain ("Rain = light") given this evidence using likelihood weighting.
The final estimate would be a weighted average of the samples, where the weights are adjusted based on the likelihood of the observed evidence. This process helps account for the evidence and provides a more accurate estimate of the probability of interest. In this example script, we have code lines: where, we set, P(Rain = light) is set to 0.3, indicating that light rain is not very likely. P(See doctor = on time | Rain = light) is set to 0.9, suggesting that if it's light rain, there's a 90% chance of seeing the doctor on time. The likelihood weighting process reflects the information encoded in the conditional probabilities specified in the example Bayesian network. ============================================
|
||||||||
| ================================================================================= | ||||||||
|
|
||||||||